Cloud and IT Infrastructure in Saudi Arabia
Designing, migrating, and running the environment a business system depends on, sized to the workload rather than to the largest available tier.
Start a projectBuild servicesThe problems it solves
Servers and networks are maintained reactively, and the recovery plan has never actually been tested.
- 01
The recovery plan has never been tested
Backups run and are assumed to work. Nobody has restored one under time pressure, so the actual recovery time is unknown.
- 02
Infrastructure is maintained reactively
Work happens when something breaks. Capacity, patching, and certificate renewal are handled as incidents rather than as routine.
- 03
Cloud spend grew without anyone deciding it should
Environments were sized for a launch and never revisited. The bill reflects the largest moment the system ever had.
- 04
Remote access was arranged in a hurry
Access was opened quickly when it was needed and never revisited, so more is reachable from outside than anyone intends.
What the work covers
Deployment, migration, and day to day operation of the environment a system runs on, sized to the workload rather than to the largest available tier.
Cloud deployment and migration
Moving workloads to cloud platforms with a rollback position at every step.
Server build and maintenance
Environments built to a documented standard so a rebuild is a procedure rather than an archaeology exercise.
Networking
Routing, switching, and firewall configuration for reliable and controlled connectivity.
Secure remote access
Access for remote and distributed teams, scoped to what each role actually needs.
Backup and disaster recovery
Backups with a tested restore and a recovery time the business has actually agreed to.
Voice and unified communication
Voice and collaboration integrated with the rest of the estate.
How it is delivered
Audit
Record what is running, where, on what, and who can reach it.
Design
Target environment sized to the real workload, with the recovery position defined up front.
Migrate
Move in stages with a rollback at each one, rather than a single cutover weekend.
Harden
Close what the audit found, and verify rather than assume.
Verify
Test the restore. An untested backup is not a recovery plan.
Operate
Monitor, patch, and review capacity on a schedule.
After launch
- Scheduled patching and certificate renewal
- Capacity review against actual usage
- Tested restore on a defined interval
- Access review as the team changes
- Incident response with an agreed escalation path
Sectors
Cargo and logistics, Warehousing, Retail and e-commerce, Travel and tourism, Food and ingredients
Questions businesses ask
Can you move our servers to the cloud?
Yes, in stages with a rollback position at every step, rather than in a single cutover weekend.
How do we know our backups work?
Restores are tested on a defined interval, with a recovery time the business has agreed to. An untested backup is not a recovery plan.
Do you set up networks and remote access?
Yes: routing, switching and firewalls, and secure remote access scoped to what each role needs.
Will you look after the environment afterwards?
Yes: scheduled patching and certificate renewal, capacity reviews against actual use, access reviews, and incident response with an agreed escalation path.
Talk to the team that will build it.
Tell us what the operation needs to do. We will tell you what it takes to get there, including the parts that are not straightforward.
Start a Project